en>Meznak (Created page with "We have several needs. You probably know someone who can help. If you do, contact [mailto:board@heatsynclabs.org board@heatsynclabs.org] to make the introduction. * Fire spri...") |
en>Milton.jay.williams No edit summary |
||
Line 13: | Line 13: | ||
** HAVE completed architectural drawings. | ** HAVE completed architectural drawings. | ||
** HAVE a contractor that is willing to work with us and let us do a lot of the work under his license. | ** HAVE a contractor that is willing to work with us and let us do a lot of the work under his license. | ||
** NEED | ** NEED Electrical Engineer calculations. Milton found someone who might help, and is trying to get him to respond again. | ||
** NEED Structural Engineer to rate upstairs floor. | |||
* City permit | * City permit | ||
** NEED electrical | ** NEED electrical |
Revision as of 20:37, 12 October 2018
We have several needs. You probably know someone who can help. If you do, contact board@heatsynclabs.org to make the introduction.
- Fire sprinklers
- We have a grant that will refund $20,000 once installation is complete.
- Inside:
- HAVE one quote for the inside construction: $23,300
- NEED two more quotes before Mesa will consider helping us.
- Outside feed:
- NEED design/survey from a civil engineer
- NEED plumber willing/able to cut concrete and install fire riser from the water main in the alley
- Electrical
- Construction/land use
- HAVE completed architectural drawings.
- HAVE a contractor that is willing to work with us and let us do a lot of the work under his license.
- NEED Electrical Engineer calculations. Milton found someone who might help, and is trying to get him to respond again.
- NEED Structural Engineer to rate upstairs floor.
- City permit
- NEED electrical
- NEED occupancy
- NEED construction
- NEED change of use
- Is a temporary permit an option?